Typical MVC Installation
Primary connections include plumbing from the holding tank, sump, or pit to the wastewater feed connection (1), plumbing from the residue pump connection (2), to the residue tank, plumbing from the distillate pump connection (3) to the distillate holding tank, and plumbing from the cleaning solution holding tank to the cleaning solution feed line (4). Finally, 480 Volt, 3 phase power is run to the main power disconnect switch located behind the operator interface panel (5). All primary components including feedstock pump, recirculation pump, vapor compressor, concentrate discharge pump, level probes, pressure transducers, etc. are pre-wired and pre-plumbed within the boundaries of the MVC. Below is a typical layout of the ENCON MVC Evaporator. Click on images for full-size view & details. Uses for the Mechanical Vapor Compression EvaporatorPotable Drinking Water and Potable Water Generation Copyright © 2007 ENCON Evaporators All Rights Reserved. |